| Sr. No. |
Description |
Remark |
Comment |
| A |
CABLE PULLING TOOLS |
|
|
| 1 |
5 ton pulling force hydraulic, computerized winch |
4 Nos |
Will be adjusted to the size of works and agreed period of completion of woks |
| 2 |
Heavy duty 20 ton hydraulic cable drum trailer |
1 No |
| 3 |
Heavy duty 20 ton (each side) cable drum stand and jacks |
4 sets |
| 4 |
7 ton hydraulic cable drum trailer |
1 No |
| 5 |
4-7 tons cable stand and jacks |
5 sets |
| 6 |
Heavy duty cable rollers |
1,500 Nos |
| 7 |
Light duty cable rollers |
300 Nos |
| 8 |
Corner rollers |
20 Nos |
| 9 |
Bell mouth for cable duct entries |
10 Nos |
| 10 |
1m to 3m long cable draw- of rollers |
10 Nos |
| 11 |
Conduit rope for pulling through ducts |
1 set |
| 12 |
Cable stockings |
Various size available |
| 13 |
Air conditioned chamber - room for 132kV cable jointing, with accessories equiped with elecricity supply |
Up to 12 Nos to be used simultaneously. |
| 14 |
Miscellaneous accessories and tolls for cable pulling works |
1 Set |
| 15 |
Excavators,JCBs,Shovels,heavy duty/ light duty cranes & trailers and any other light or heavy machinery equipments |
Any required number can be engaged/ hired. |
| B |
MANPOWER |
Manpower will be allocated for perticular project as per completion chart and specific requirements of route. |
| C |
OTHER COMPANIES SERVICES DURING EXECUTION OF WORKS |
Laboratory for measuring Soil parameters,road crossing (thrust or directional boring),surface reinstatement,RCC troughts,concrete tiles,route makers,warning tapes,UPVC ducts,ready mix concrete,transporters and heavy equipment hiring companies to carry out their part of works are certified and approved by authorities. |