Centaur Electro-Mechanical Trading ISO 9001
Home Contact Us
     
   
High Voltage Substations High Voltage Substations
   
     
 

Scope of Services

We offer a comprehensive range of services relevant to all stages of HV substations projects including design, supply, erection, testing, commissioning, issuing of O&M manuals and maintenance during the guarantee period.

Our services are tailored to suit requirements of each particular client in accordance with particular tender specifications, international standards and good engineering practices.

As a subcontractor, our services range from complete project management including erection, testing and commissioning of HV Substations to only ETC under management of main contractor. Should detailed design of substations or power system analyses be required, we can offer detailed information on specialized companies as a part of our services package.

S.NO DESCRIPTION SCOPE OF SERVICES
1 Gas Insulated Switchgear upto 400kv Transportation, installation, testing & commissioning.
2 Gas Insulated Switchgear upto 132kv Supply, transportation, installation, testing & commissioning.
3 Control, Relay, Busbar protection panel & LVAC panels Design, supply, installation, testing & commissioning.
4 DC battery system (with charger, DCDB) Supply, installation, testing & commissioning.
5 Power transformer upto 400kV, 500 MVA Transportation, placement of main tank, installation, oil treatment, testing & commissioning.
6 Power transformer upto 132kV, 300 MVA Supply, transportation, placement of main tank, installation, oil treatment, testing & commissioning.
7 Auxiliary transformers upto 2 MVA Supply, transportation, installation, testing & commissioning.
8 Cable support system Design, supply & installation.
9 AC power cables Supply, laying, testing & commissioning upto 132kV and only laying for 400kV.
10 AC/DC control cables Cable sizing calculation, supply, laying, termination & testing.

220kV GIS Groupe Schneider
220kV GIS Groupe Schneider
SEWA Contract No DST/98/164
Sajja 220/132/33kV Substation
132kV GIS Mitsubishi
132kV GIS Mitsubishi
FEWA Contract E06/2004(1)
Installation, Testing, Commissioning of 132/33kV Substation in West Area of Northern Emirates
Related Links
 
» Scope of Services
» Tools & Equipment
» Contracts
» Photo Gallery
» Transformer Installation
 
     
   
Employee Login